| Collection Name | Tate Public Records: Buildings: Phase III North West Quadrant |
| RefNo | TG 14/10/5 |
| Level | File |
| Title | Architects Llewelyn-Davies, Weeks, Forestier-Walker & Bor Tate Gallery Phase III Design report |
| Date | 1974-1978 |
| Extent | 1 folder |
| Access Status | CLOSED |
| Location | Red Zone |
| Closure Criterion | Closed under Freedom of Information exemption s.31 |
| Record Opening Date | 01/01/2078 |
| Legal Status | Public Record |
| Notes | With structural engineering plans for the new gallery. Plan at Lecture Theatre level, (K100 B). Plan at Gallery Level (K102 A). Typical Cross Section (K106 B). Proposed Ramp in Registrars Office and Department Of the Environment Workshop Area (K108). Suspended Slab to Microform and Storage Area (K109 A) The following drawings prepared for the Department of the Environment on behalf of the Tate Gallery: Gallery Level Plan (AB3/2/14). Location Plan (AL3/G/1). Basement: Lecture Theatre Plan (AB3/2/13). Lecture Theatre Plan Finishes (AD3/2/32 A). Print Studio Microfilm & Storage plans & sections (AB3/3/10). Toilets below Sargent Stair (AB3/6/19). Registrars Office and Workshop Plans (AB3/9/11). Basement Sandwich/Cloaks & Storage Plans & Sections Finishes (AD3/3/30A) |