| Description | Plans by Herzog & de Meuron for the Tate Contemporary project:
Level 1 Oil Tanks Plan: Phase 1A (B126.1-05-002B), Level 2 Oil Tanks Plan: Phase 1A (B126.1-05-003B), Level 1 & 2 Oil Tanks cross sections (B126.1-05-005), Level 1 & 2 Oil Tanks cross sections (B126.1-05-006), Level 1 Oil Tanks Plan: Phase 2A (B126.1-05-007B). |